Andover Plaza
Medical Radiation/Oncology Treatment Center
200 Andover Park E. | Tukwila, WA. 98188
Call / Email to schedule a tour!!
![]() | ![]() |
|---|---|
![]() Arial suite | ![]() Suite 1_ Andover Plaza plan |
FEATURES
Location Information:
-
Easy Access to I-5 / 405 & SR-67
-
End-Cap Suite #100
-
Abundant / Free Parking
-
Walking Trails / Sit-down/Take-out restaurants, too many adjacent amenities to list
-
PARK TENANTS
-
WA State DMV
-
Concentra Medical
-
Sound Credit Union
-
US Health Works
-
Benca Dentistry
-
Suite Specs/Info:
-
Prior tenant was a Cancer Center specializing in radiation oncology, providing state-of-the-art treatments for cancers including prostate, breast, head/neck, colorectal, brain/CNS, bone, skin, lung, gynecologic, and metastatic disease.
Vault type:
-
High-density concrete shielded vault optimized for radiation oncology LINAC (high-energy beam shielding) / for Varian Clinac 21iX-series LINAC (high-energy X-ray beams, 6-25 MV) or similar.
Prior Vault equipment:
-
The vault housed a 2011 Varian Clinic 21iX-series linear accelerator (LINAC), with associated CT simulator gantry (e.g. GE Optima CT580), bariatric treatment table, and Dorado laser system.
Dimensions/Specs:
-
Neutron shielded, ksi 50 grade steel, lead and polyboran shielding throughout.
-
Automated 71” door, w/ 48” doorframe
-
Walls: 8 ft thick (all sides)
-
Roof slab: 13 ft thick (above 10 ft ceiling)
-
Floor slab: 3 ft thick (sits on -3 ft elevation)
-
Pit: 13 ft 9 in deep x 5 ft 6 in wide (under gantry)
-
Footprint: 36 ft x 32 ft overall (22’x13’x10’ height interior)
-
Concrete Reinforcement (Rebar Schedule)
-
Walls: #8 bars @ 12” o.c. both ways, both faces (4 curtains noted)
-
Roof: #6 bars @ 12” o.c.
-
Floor: #7 bars @ 12” o.c. both ways
-
Dowels/Laps: #6 @ 12” o.c., 3 ft min lap, 3” cover
Build Sequence Highlights
-
Excavate: To -4 ft, add crushed rock base (soils report required)
-
Pour Floor/Pit: 3 ft slab, align with existing floor (±1/4” lip)
-
Walls & Roof: Form/pour 8 ft/13 ft thick, tie to building trusses (8 ft spacing)
-
Supports: 4x4 steel tubes (HSS) w/ 5/8” epoxy anchors; 2.5 ft deep concrete saddles
-
Shielding Add-Ons: Steel plates in walls/roof; foam gaps; door recess (S4.1)
-
Finish: Grout pit base (147 lb/ft³, 2000 psi, 7-day cure pre-equipment)





